Preparation affects the outcome
Before painting or exterior improvement work, dirt, loose deposits and biological buildup should be evaluated. Cleaning may be one stage of preparation, alongside repairs, scraping or primer recommended by the project contractor.
Coordinate with the work schedule
Cleaning methods and drying time depend on materials and weather. ShineXD can coordinate exterior cleaning scope with access and renovation milestones.
Match cleaning to the substrate
Concrete, painted siding, wood, masonry and decorative materials require different approaches. The goal is to clean appropriately without compromising the material or planned finish.
